Project Description: This project located on the west side of 64
th Avenue will connect James E. Billie Drive, south to N. 26
th Street.
The 2.5 acre parcel will include (6) home sites approximately 90’ x 120’, a north/south sidewalk connection, a two-way roadway and a 25’ grassed retention area.